Motion Computing FWS-DS1 Manual de usuario Pagina 245

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 257
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 244
GTE
-
Florida
Wholesale Non-recurring Cost
Study
Field
Work
Sub-Loop
Unbundling
Activity Summary
-
Field
Installation
I
Average Drive Set-Up Verifying Removing
Running
Dialing Complete
Distance Time Time Time lumoers lumoers
into Awas Time Total
Work
Total
Average Customer Terminal
Unbundled
Network
FlPmPntr.
(UNE5)
Exchange Products
Sub-Loop Unbundling
Customer Terminal
California
Florida
Illinois
North Carolina
Texas
Washington
0.73
2.86
~~ ~~ ~~~~~~
,
~~~~~r
~~~
,
~~~
(Miles) (Minutes) (Minutes) (Minutes) (Minutes) (Minutes) (Minutes) (Minutes) Time Time Destination
A=Note
1
B=Note
1
C=Note
1
D=Note
1
E=Note
1
F=Note
1
G=Note
1
H=Note
1
I=Sum(C..
J=B+I
0.65 2.41
,
0.70 3.12
0.58
2.38
0.92 3.07
0.62 2.77
0.88 3.42
3.21
1.01
2.01
2.48
2.42
2.34
2.25
1.14
0.26
0.47
0.52
0.49
0.64
0.59
0.32 1.58
7.23
0.16
0.28
4.63
0.23
0.40 5.69
0.24 1.37
8.69
0.47 0.96
5.19
0.85
2.35 4.62
0.38 1.16
6.01
4.30 17.78
20.19
1.23
7.57
10.69
2.19
10.99 13.37
2.87
16.17 19.24
2.09
11.62 14.39
2.21
13.01 16.43
2.48
12.86 15.72
AlNS
5.3
Note
1:
These figures are the results
of
Jumper and Drive Time Studies conducted in California, Florida, Illinois, North Carolina, Texas, and Washington
GTE
Confidential
ASBL-2
Vista de pagina 244
1 2 ... 240 241 242 243 244 245 246 247 248 249 250 ... 256 257

Comentarios a estos manuales

Sin comentarios