
GTE
-
Florida
Wholesale Non-recurring
Cost
Study
Field
Work
Sub-Loop
Calculations
Central Office
Field
Loaded
Loaded Total Minutes per Labor Rate Total
Minutes per Probability of Labor Rate Field Initial Probability
of
Per C.O.
LindCkt Occurrence Per Minute Cost LindCkt Occurrence Minute Cost Destination
Description
L=AINS5..8 C=AINS5..8 D=AINS5..8 E=A*B*C F=AINS5..8 G=AINS5..8 H=ALLR-1
I=F'G*H
nbundled Network Elements (UNEs)
Exchange
Products
Additional Line
Sub-Loop Unbundling
ED1
-
Distribution Interconnection
New
Cross Box
Customer Location
Total
3.77
96.00
100.00%
27.57%
$0.49
$1.85
$0.49
$12.97
$14.82
n/a
nla
$0.00
$0.00
$0.00
FWSl
Disconnect
Cross Box
Customer Location
Total
Change Facility Connection
Serving Terminal Interconnection
Customer Location
New
Disconnect
Change Facility Connection
100.00%
0.30%
$0.49
$1.85
$0.49
$0.26
$2.11
$0.49
$1.85
$0.00
$O.W
$0.00
FWSl
00.00
FWSl
3.77
178.36
3.77 100.00%
100.00%
100.00%
100.00%
$0.49
$1.04
$0.49
$1.04
$0.49
$1.04
$0.00
FWS1
s0.m
FWSl
$0.00
FWSl
2.12
2.12
2.12
GTE
Confidential
SBLC-4
Comentarios a estos manuales