
?
?
GTE
-
Florida
Wholesale Non-recurring Cost
Study
Field
Work
Sub-Loop
Calculations
Field Central Office
1
Description
nbundled Network Elements (UNEs)
Exchange Products
Initial Line
New
Sub-Loop Unbundling
FDI
-
Distribution Interconnection
Cross
Box
Customer Location
Total
Disconnect
Cross
Box
Customer Location
Total
Change Facility Connection
Serving Terminal Interconnection
Customer Location
New
Disconnect
Change Facility Connection
Loaded
Loaded Total Minutes per Labor Rate Total
Minutes per Probability
of
Labor Rate Field Initial Probability
of
Per C.O.
UndCkt Occurrence Per Minute Cost LindCkt Occurrence Minute Cost Destination
k==.A!Nf5
8
C=AINE5
8
D=AINS5..8 E=A'B*C F=AINS5..8 G=AINS5..8 H-ALLR-1 I=F*G'H
23.24
182.82
23.24
178.36
23.24
15.72
15.72
15.72
100.00%
27.57%
100.00%
0.30%
100.00%
100.00%
100.00%
100.00%
$0.50
$11.62
n/a
$0.50 $25.20 n/a
$36.82
$0.49
$11.39
n/a
$0.49 $0.26 n/a
$11.65
$0.50
$11.62
$0.50 $7.86
$0.49 $7.70
$0.50 $7.86
GTE
Confidential
00.00
$0.00
$0.00
FwSl
$0.00
$0.00
$0.00
FWSl
$0.00
FWSl
$0.00
FWSl
$0.00
FWSl
50.00
FWSl
SBLC-2
Comentarios a estos manuales